JMS Engineers led the structural and civil engineering efforts on a four-storey Mikvah development in the London Borough of Haringey, an essential facility for the community. JMS began by overseeing the demolition of existing structures, followed by the installation of an unpropped contiguous piled perimeter retaining wall, reinforced with a capping beam, and subsequent excavation to form a habitable basement.
For the superstructure, JMS designed a robust reinforced concrete framework to support the three above-ground levels, which include a second-floor plant room. Once completed, the building will feature 44 private bathrooms and six Mikvah pools, distributed across the lower floors. JMS provided a full civil and structural design service, ensuring the project met the highest standards of stability and functionality.